Outline specification
Specifications are written documents that describe the materials and workmanship required for a development. They do not include cost, quantity or drawn information but need to be read alongside other contract documentation such as quantities, schedules and drawings.
Written information about materials and workmanship should not appear on drawings or in bills of quantities as this can result in contradictory specifications and can cause considerable confusion, instead they should refer to the appropriate clauses in the specification.
Specifications should be developed iteratively alongside the design, and not left until the preparation of production information.
The first stage in the development of a specification is the preparation of an outline specification. An outline specification is a brief description of the main components to be used in construction. They should be described in sufficient detail to allow the cost consultant to prepare some approximate quantities.
Components might include:
- Substructure.
- Superstructure.
- Cladding (including external windows and doors).
- Roofing.
- Internal walls and partitions.
- Internal doors.
- Ceilings.
- Flooring.
- Finishes.
- Building services (including lighting, heating, ventilation and air conditioning, water supply and drainage and other special installations).
- Fixtures and fittings (such as sanitary fittings).
- Landscape.
[edit] Related articles on Designing Buildings Wiki
- Bills of quantities.
- Contract documentation.
- Final specifications.
- Insulation specification.
- Output-based specification.
- Performance specification.
- Prescriptive specification.
- Procurement route.
- Production information.
- Project brief.
- Schedule of accommodation.
- Specification.
- Specification basics.
- Tender.
- Tender documentation.
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Comments
We have a set of 250 free Outline and Shortform specifications at arcat.com - http://www.arcat.com/users.pl?action=ProjectsAdmin&mf=04